Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Aalto, L, Sirola, P, Kalliomäki-Levanto, T, Lahtinen, M, Ruohomäki, V, Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(06), 1047–62.

Daniel, E I and Pasquire, C (2019) Creating social value within the delivery of construction projects: the role of lean approach. Engineering, Construction and Architectural Management, 26(06), 1105–28.

Du, J, Wang, Q and Shi, Q (2019) Description–experience gap under imperfect information. Engineering, Construction and Architectural Management, 26(06), 1151–70.

Edwards, P and Bowen, P (2019) Language and communication issues in HIV/AIDS intervention management in the South African construction industry. Engineering, Construction and Architectural Management, 26(06), 962–88.

  • Type: Journal Article
  • Keywords: South Africa; Communication; Construction industry; HIV/AIDS management;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-12-2017-0260
  • Abstract:
    Effective communication is a key factor in presenting Human Immunodeficiency Virus/Acquired Immune Deficiency Syndrome (HIV/AIDS) awareness and prevention campaigns, and delivering treatment programmes, particularly in South Africa where different ethnic groups and a diversity of languages and educational attainment levels are encountered. Language is an important element of such communication. The purpose of this paper is to examine the communication effectiveness of AIDS-related intervention messages. Design/methodology/approach Case-based semi-structured interviews, with 42 employees from three construction organisations, and with six telephone counsellors from a service provider, were used to explore language in the HIV/AIDS context in the construction industry in the Western Cape region. Findings Workers’ knowledge about HIV (a key element in prevention and willingness to engage in treatment regimes) tended to align with their level of education. African cultures may inhibit the use of plain language about AIDS. Graphic posters with text in different languages were the most preferred communication media, but need periodic refreshment to remain effective. For toolbox talks and other company presentations, a comprehensive approach to language differences is limited, and appropriate confirmatory feedback loops are not used – the message sent is not always the message received. The recruitment and training processes for service provider counsellors ensure a more comprehensive grasp of HIV knowledge and a more consistent approach to communication. Practical implications Construction organisations should be more careful in their HIV/AIDS campaigns and programmes, ensure better targeting of audiences and pay more nuanced and sensitive attention to language needs, gender differences and cultural contexts with respect to communicating with workers in ways that engage them more fully about HIV/AIDS, stigma and disclosure. Originality/value Communication effectiveness is pivotal in the provision of intervention management by construction firms. Ineffective language and communication processes directly and adversely influence HIV/AIDS intervention management success.

Li, L, Li, Z, Li, X and Wu, G (2019) A review of global lean construction during the past two decades: analysis and visualization. Engineering, Construction and Architectural Management, 26(06), 1192–216.

Lingard, H, Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(06), 886–906.

Munir, M, Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(06), 1171–91.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(06), 945–61.

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(06), 1004–23.

Shrestha, K, Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: in-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(06), 927–44.

Shrestha, P P, Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(06), 1087–104.

Shurrab, J, Hussain, M and Khan, M (2019) Green and sustainable practices in the construction industry. Engineering, Construction and Architectural Management, 26(06), 1063–86.

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(06), 989–1003.

Yalcinkaya, M and Singh, V (2019) Exploring the use of Gestalt’s principles in improving the visualization, user experience and comprehension of COBie data extension. Engineering, Construction and Architectural Management, 26(06), 1024–46.

Zhu, F, Sun, M, Wang, L, Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects. Engineering, Construction and Architectural Management, 26(06), 907–26.

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(06), 1129–50.